The top layer of pipework, after the membrane, sand and gravel had been applied, during the construction of a sand and gravel drainage system

The top layer of pipework, after the membrane, sand and gravel had been applied, during the construction of a sand and gravel drainage system
图片
点 击 查 看 大 图
会员专享The top layer of pipework, after the membrane, sand and gravel had been applied, during the construction of a sand and gravel drainage system
  • 素材ID:1003208397
    举报
  • 格式:JPG
  • 作者:plazaccameraman
  • 尺寸:
    S1000 x 751px · 35 x 26cm · 72dpi
    M2300 x 1729px · 81 x 60cm · 72dpi
    L4000 x 3007px · 33 x 25cm · 300dpi
    F4608 x 3456px · 39 x 29cm · 300dpi
关键词
出水过滤耙子石料水暖地下处置重用排水系统地球净化回收利用接地弄脏了污垢污水处理铲斗工业排水管沙子土地海沟过滤器蒸馏存储现场地坑行业设备管道户外污水施工安装浇筑砾石下水道废弃物铲子